Our work consisted of all of the wiring needed for a new gas station, with a convenience store.
- We installed a new 400 amp three phase underground service.
- We installed a transfer switch for an emergency generator.
- We installed a 200 amp rated three phase sub panel.
- All new LED lights were installed on the interior and exterior as per plans and specs.
- Outlets and circuits were installed for all appliances, computers, cash registers, display cases, etc.
- Wiring was installed to new walk-in refrigerator unit.
- A 70 amp three phase circuit was installed to a raintight disconnect on the roof and the HVAC unit was hooked up.
- An application for inspection was submitted, and a certificate of approval was obtained for the contractor and property owner