- The work done was to repair fire and water damage.
- The new wiring was done in MC cable.
- Chandeliers were removed and reinstalled in the church area.
- 2×4 LED flat panel fixtures were replaced due to water damage in the lower-level classrooms.
- Exit fixtures and emergency fixtures were replaced.
- All wiring was done to comply with National Electric Code and NEMA Standards (National Electric Manufacturers Association).
- An application for inspection was submitted and a certificate of approval obtained upon completion.




