Our work included the following service repairs:
1) Removal of the old wood mast
2) Installation of a new 2 1/2″ galvanized service mast with 100-amp weather head and new point of attachment for PSEG
3) New PSEG approved by-pass meter socket
4) 100-amp copper conductors
5) New ground rod
6) New utility company bonding terminal
7) Refeed existing 100-amp panel
- Submit an application for inspection
- Provided PSEG with a temporary certificate
- Obtain a permanent certificate of approval for the property owner and building department