The work was done in a commercial building and included:
- Removing existing 2×4 fluorescent fixtures
- Install new 2×4 flat panel LED fixtures
- Extending and reconnecting to the existing circuit wiring
- Supporting the fixtures independent of the suspended ceiling
- Installation of new LED hi hat fixtures and dimmer







