The work done was as follows:
- Install a new circuit breaker panel
- Replace existing switches, outlets and plates
- Install arc fault circuit interrupters (as required by code)
- Install new GFI weather proof outlet
- Install new customer supplied hi hat fixtures in living room
- Install ceiling fan support box, assemble and install customer supplied ceiling fan
- Rewire (2) bathrooms and install GFI outlets on separate 20-amp circuits
- Rewire kitchen including new appliance circuits, GFI protection, AFCI protection, new lighting, etc.
- Submit application for inspection and obtain certificate of approval

