This job was done in Manhattan

It involved replacing the existing building service with a new 800-amp 120/208 volt 3 phase service.

We installed (3) 400-amp services to (3) individual areas of the building.

We installed a Con Ed approved detail box.

The grounding system was also updated.

Basement lighting was done including (4) new 4-foot LED fixtures.

A permit and certificate of approval was obtained from the NYC Bureau of Electrical Control.