Our job was to replace a burned PSEG meter socket.
- This was an underground service
- We installed a new 200-amp PSEG approved underground service meter socket
- We extended the existing underground feeder to the new meter socket
- We rewired the 100-amp conductors from the meter socket to the existing panel
- We upgraded the grounding system to comply with current codes




